QUALITY ASSURANCE
-
Our company firmly believes in quality and the concepts of Quality Assurance & Quality Control are well understood by us.
-
The supplier will be asked to produce necessary type test certificates.
-
No additional or excess material will be supplied, Other than the requirement & as per the AFC drawings. (Approved for Good Construction.)
-
All the materials will be visually checked for any physical or mechanical damages & for missing or short supply items.
-
The materials received at site will be properly stored and identification tags will be provided before using the material for the work.
-
For all the major equipment supplied by us, all necessary factory test certificates, instruction manuals will be documented after necessary inspection at manufactures works.
-
If required, The major materials & equipment will be sent for laboratory conforming to related IS codes.
-
Checking of all plumbing related civil works such as chambers plastering, waterproofing, reinforcement, proper installation of pipes etc.... with Clients Engineer/authorised PMC Persons.
-
Usage of proper equipment such as chasing machine for wall chasing, threading machine for pipe threading, Cutter machine for pipe cutting, breaking machine for PCC/RCC Breaking etc.
-
No combustible materials should be stacked or dumped in and around the company site stores or labour hutments.
-
No worker must fool around whilst working. Strict action will be taken if any worker is found not adhering to these safety rules.
-
Internal safety audit should be carried out each month by the site staff where inspection of all tools, electrical equipment's, gas cutting set (tube/nozzle/valves), etc. must be thoroughly checked. All defective parts or materials must be replaced immediately and the faulty part returned to the head office.
-
All staff and workers must be disciplined, well dressed, well-mannered and not argumentative or aggressive.
-
Smoking, alcohol consumption, and drugs are strictly banned at site. Any staff or worker reporting intoxicated at site will be immediately dismissed.
-
All / Any accident however minor must be immediately reported to the management and the Head Office.
-
Proper permission and written approval must be taken prior to working at heights, night works, or hot works.
-
The site store room, labour hutments and all areas should be kept clean and free from hindrances. No combustible materials, scrap, debris should be left at site. Housekeeping should be carried out on a weekly basis.
-
All excavated trenches, manholes, open drains must be properly barricaded using safety tapes, signs etc.
-
Use of mobiles, iPods, radios and other electronic entertainment devices is strictly banned whilst working on site.
-
No visitors, relatives, friends etc., are allowed within the site premises or inside labour rooms.
-
The Company I.D. cards issued have to be kept safely and duly returned upon expiry or when leaving the service. Loss of I.D. The card has to be reported to the Head Office immediately.
-
It is the duty of all staff and workers to safeguard the Company materials, tools, scrap, etc.
Site and Office STAFF RESPONSIBILITIES
PROJECT MANAGER :
- Overall responsibilities and in-charge of the entire site
- To report to the General Manager and co-ordinate all instructions of Management.
- Project planning, management and maintenance.
- To check shop drawing and working drawings and record any change in execution.
- Mobilization of resources and machinery.
- To check the R.A. bills and work as per the tender specification.
- To attend all site progress and safety related site meetings.
- To plan the work and ensure the material availability well in advance.
- Implementation of quality and safety standards.
- To ensure timely completion of work with required quality and safety standards.
- To check progress reports, daily reports, work permits etc.
- Monitoring the cash flow requirement.
- Staff and labour welfare and training of sub ordinates.
SITE SUPERVISORS : PLUMBING
- To report to the Project Manager.
- To execute the works as per the approved drawings.
- To maintain the quality standards and timely completion of works.
- To monitor the scope available and report any non-availability of scope to the Project Manager and the Project Management Consultant (PMC).
- To clear any hurdles that might arise in the work in co-ordination with Project Manager and the Project Management Consultant (PMC).
- To submit daily site reports and progress reports.
- To take joint measurements on a day to day basis and prepare R. A. Bills.
- Optimum utilization of resources available.
- Housekeeping and safety standards.
QUALITY POLICY
We at H. Jasvantrai Engineering Pvt. Ltd. are committed to execute :
- Plumbing, Fire Fighting work as per the customer's needs and satisfaction.
- Giving optimum Service and Quality within the stipulated time frame.
- Continually upgrading the effectiveness of the Quality Management System
- Learning the latest trends and technological advances.
- Correct implementation of the technological advances at site.
- Having a diligent, transparent, ethical and dynamic approach.
- Work as per norms of Local Authorities & IS Code.
PROJECT SCHEDULES
Components in Project Schedules :
- Ideal Bar Chart
- Master List of Drawing Records
- Master List of Material Submittals
- Material Delivery Schedule
- Approximate Monthly Planning of Labour Strength
- Monthly Cash Flow Statement